亚洲熟妇AV在线观看,大香蕉高清在线,99久久无码国产精品性出奶,丁香五月成

網(wǎng)站公告-NOTICE
航豐實業(yè)·產(chǎn)品分類
聯(lián)系我們
濟(jì)南航豐實業(yè)有限公司

電話:15168870138
聯(lián)系人:龐經(jīng)理

網(wǎng)址:http://m.b10015.cn  

廠址: 德州市禹城市莒鎮(zhèn)產(chǎn)業(yè)園26棟

經(jīng)銷商地址:天橋區(qū)建華五金市場東區(qū)5-1  

魯ICP備09095923號-1

新聞資訊

當(dāng)前位置:首頁 / 新聞資訊

電纜橋架電纜是如何有層次的排列

橋架對于一些修建施工的人來說并不生疏,它在咱們的日子中扮演著比較重要的人物,只要合理有序的組織才干更好的確保全體的。那么濟(jì)南電纜橋架上的電纜是怎么有層次的擺放的呢?接下來咱們就為我們做簡略的剖析。
The bridge is not unfamiliar to some people who build it. It plays an important role in our lives. Only a reasonable and orderly organization can better ensure the safety of all. So how does the cable on Jinan cable bridge have layered arrangement? Next let's do a brief analysis for us.
濟(jì)南電纜橋架
Ji'nan cable tray
1.濟(jì)南電纜橋架層次擺放應(yīng)是弱電流操控電纜在上層,接著是一般操控電纜,低壓動力電纜、高壓動力電纜依次往下擺放。這種擺放有利于屏蔽干擾、電力電纜冷卻、便于施工。
1. The layers of Jinan cable bridge should be the top layer of weak current control cable, followed by general control cable, low voltage power cable and high voltage power cable in turn. This arrangement is conducive to shielding interference, power cable cooling and easy construction.
2.各層電纜橋架層間的間隔為:
2. the interval between each cable bridge deck is as follows:
操控電纜≥200mm
Control cable is more than 200mm
動力電纜≥300mm
Power cable is more than 300mm
機(jī)械化敷設(shè)電纜≥400mm
The mechanized laying cable is more than 400mm
山東電纜橋架
注意事項:
Matters needing attention:
1.XQJ型電纜橋架設(shè)備的大載荷、支撐間隔應(yīng)小于答應(yīng)載荷和支撐跨距。
The maximum load and support interval of 1.XQJ cable bridge equipment should be less than the promised load and supporting span.
2.挑選電纜橋架的寬度時應(yīng)留有必定的備用空位,以便為往后增加電纜用。
2. when selecting the width of the cable tray, there must be a certain reserve space to increase the cable for the future.
3.當(dāng)電力電纜和操控電纜較少時,可用一電纜橋架設(shè)備,但中心要用隔板將電力電纜和操控電纜離隔敷設(shè)。
3. When there are fewer power cables and control cables, a cable bridge can be used, but the center of the cables and control cables are separated by diaphragms.
4.電纜橋架水平敷設(shè)時,橋架之間的銜接接頭應(yīng)盡量設(shè)置在跨距的1/4左右處.水平走向的電纜每隔2米左右固定一下,垂直走向的電纜每個1.5米左右固定一下。
4. When laying the cable bridge horizontally, the joints between the bridges should be set at about 1/4 of the span as far as possible. Horizontal cable should be fixed every 2 meters, vertical cable should be fixed every 1.5 meters.
5.電纜橋架莊子應(yīng)有牢靠接地。如間隔的電纜橋架每隔30-50米接地一次。
5. cable bridge Chuang-tzu should be firmly grounded. For example, the span of the cable tray will be grounded once every 30-50 meters.
6.電纜橋架設(shè)備除需屏蔽裝保護(hù)罩外,在室外設(shè)備時應(yīng)在其加裝保護(hù)罩,避免日曬、雨淋。對如需焊接設(shè)備時,焊接四周的焊縫厚度不得小于母材的厚度,焊口有必要防腐處理。
6. In addition to shielding protection cover, cable bridge equipment should be installed on the top of the outdoor equipment to avoid sunshine and rain. If the welding equipment is needed, the thickness of the weld around the welding should not be less than the thickness of the base metal, so it is necessary to treat the weld corrosion.
(文章由:濟(jì)南航豐實業(yè)有限公司提供,對山東電纜橋架感興趣趣的朋友可以關(guān)注我們http://m.b10015.cn,我們將為您提供新的新聞)
(The article is provided by Jinan Hanfeng Industry Co., Ltd. Anyone who is interested in Shandong cable bridge can pay attention to us at http://m.b10015.cn. We will provide you with the latest news.)
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
欧美 伦理 日韩 在线| 极品美女销魂一区二区三区在线播放| 亚洲成人网在线视频| 无码人妻一区二区三区蜜桃臀| 亚洲人人插一区二区三区| 五月一区二区久久久综合天堂| 熟女吃瓜视频在线| 五月丁香婷婷播放| 日本无码一区区| 国产欧美日韩二区三区四区| 日本丰满少妇免费一区| 蜜臂www| 丝袜伦理片| av午夜福利亚洲精品| 大香蕉伊二二区| 青青草亚洲av| 天天干天天天爽天天爽天天爽天天| 二区在线porn| 大香蕉在线视频精品观看VIP| 一区 亚洲 欧美 综合| 亚洲欧洲精品一区| 亚洲3D成人av影院| 美女调教网站视频| 操比视频一区| 91美女麻豆| 日本欧美久久一区| 日韩一级av片| 台欧久久精品视频| 久久视人黄色片| AV 极品牛鲁| 亚洲色欲在线播放一区| 欧美激情无码社区| 白天日夜夜 操| 中字久久久久久| 欧美成人夜夜操| 97一区在线| 国产精品禁99精品| AV在线中文字幕強| 丝袜小说色| 91视频欧美毛| 亚洲精品thepoen|