亚洲熟妇AV在线观看,大香蕉高清在线,99久久无码国产精品性出奶,丁香五月成

網(wǎng)站公告-NOTICE
航豐實(shí)業(yè)·產(chǎn)品分類
聯(lián)系我們
濟(jì)南航豐實(shí)業(yè)有限公司

電話:15168870138
聯(lián)系人:龐經(jīng)理

網(wǎng)址:http://m.b10015.cn  

廠址: 德州市禹城市莒鎮(zhèn)產(chǎn)業(yè)園26棟

經(jīng)銷商地址:天橋區(qū)建華五金市場東區(qū)5-1  

魯ICP備09095923號-1

新聞資訊

當(dāng)前位置:首頁 / 新聞資訊

橋架的連接件在安裝時(shí)要注意什么?

橋架在安裝的時(shí)候直線階段之間還有彎通變形直通的連接件,   應(yīng)采用橋架制造廠配套的連接件。連接件薄鋼板厚度不應(yīng)小于橋架薄鋼板厚度。接口應(yīng)平整,無扭曲、凸起和凹陷,連接用的半園頭鍍鋅螺栓,半園頭應(yīng)在橋架內(nèi)側(cè),螺栓長度適當(dāng),擰緊之后,露出長度以2~5牙為宜。水平安裝的橋架,其直線段的連接頭,應(yīng)盡量設(shè)在兩個(gè)支吊架之間的1/4左右處。
During the installation of the bridge, there are also curved, deformed, and straight connectors between the straight stages, which should be matched by the bridge manufacturer. The thickness of the connecting thin steel plate should not be less than the thickness of the bridge thin steel plate. The interface should be flat, without distortion, protrusion, or depression. The half round head galvanized bolts used for connection should be on the inner side of the bridge, and the bolt length should be appropriate. After tightening, the exposed length should be 2-5 teeth. For horizontally installed cable trays, the connection head of the straight section should be set at around 1/4 of the distance between the two supports and hangers as much as possible.
1.一般情況下不在施工現(xiàn)場制作橋架。由于特殊原因必需時(shí),可利用現(xiàn)有的橋架改制非標(biāo)準(zhǔn)彎通和變徑直通。改制和切斷直線段橋架時(shí),均不得用氣、電焊切割,應(yīng)用專用切割工具。改制的橋架必須平整,及時(shí)補(bǔ)漆,面漆顏色應(yīng)與其它橋架相近。因?yàn)樾陆ńㄖ锢?,橋架安裝一般都在混凝土結(jié)構(gòu)工程完成數(shù)月甚一年之后進(jìn)行,混凝土收縮逐漸減小。伸縮量一般不會(huì)超過建筑物伸縮縫寬L。
濟(jì)南電纜橋架
1. Generally, cable trays are not manufactured on the construction site. If necessary due to special reasons, existing cable trays can be used to modify non-standard bends and variable diameter straights. When restructuring and cutting straight section cable trays, gas or electric welding cutting is not allowed, and special cutting tools should be used. The restructured cable tray must be flat, repainted in a timely manner, and the color of the topcoat should be similar to other cable trays. In new buildings, the bridge installation is usually carried out months or even a year after the completion of the concrete Structural engineering, and the concrete shrinkage gradually decreases. Generally, the expansion amount will not exceed the width L of building Expansion joint.
2.橋架跨越建筑物的伸縮縫處,按GB50168規(guī)定,應(yīng)設(shè)置伸縮縫,保證橋架及敷設(shè)在橋架內(nèi)的電纜在建筑物伸縮不危及其本身時(shí)能自由伸縮,不受損壞。
2. At the Expansion joint where the bridge crosses the building, Expansion joint shall be set according to GB50168 to ensure that the bridge and the cable laid in the bridge can expand freely without damage when the expansion of the building does not endanger its own safety.
3.若發(fā)現(xiàn)或從土建單位了解到建筑物伸縮縫較大有可能超過L時(shí),以便于在橋架中留電纜(或電線)的伸縮余量,這個(gè)余量應(yīng)大于伸縮縫寬L。應(yīng)按實(shí)際做好伸縮處理。要跨越伸縮縫的橋架少一側(cè)有較長的直線段,宜超過30m,或伸縮縫兩側(cè)直線段橋架相加有30m,中間無水平或垂直彎通。
3. If it is found or learned from the civil engineering unit that the Expansion joint of the building is large and may exceed L, so as to leave expansion allowance for cables (or wires) in the bridge, this allowance should be greater than the width of Expansion joint L. Expansion and contraction treatment should be done according to the actual situation. At least one side of the bridge to cross the Expansion joint has a long straight section, which should exceed 30m, or the straight section bridges on both sides of the Expansion joint add up to 30m, and there is no horizontal or vertical bend in the middle.
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
亚洲夜夜人人| 国产精品吃瓜| 国产一区二区.av| 欧美一区九九九| 日韩美女视频网址| 国产成人av青青草| 噜噜噜干干人妻网| 日韩无码不卡顿| 几把操逼视频啊啊啊哈| 色悠久久综合| 肏屄狠狠肏| 丰满人妻一区二区三区中文件| 国产日韩免费五区| 国产激情高潮一区二区| 内射h| 国产一射视频| 亚洲成人77777在线播放| 色狠狠久久αⅴ北条麻妃| 亚洲精品永久无码午夜福利| 日韩有码中文字幕一区二区| 久久精品夜夜夜夜久久| 中文字幕人妻国产| 嗯嗯好大久久| 亚洲视频 激情小说| 欧美日韩精品一区三区| 肉色丝袜脚交一区精品| 午夜福利av手机在线播放| 日本本道91| 欧美操逼亚洲| 强姧伦理至久久久久久久?| 精品美女永久免费视频| av直接在线观看| 人妻一区二区三区AV资源| 猛烈草b日逼视频| 国产97com| 亚洲精品六| 日本伊人大香蕉久久久男人的天堂| 用鸡插美女网站| 99rez 在线 视频| 色天堂综合在线| 美女少妇内射午夜|